Cast

2025

49min 0

4

ratingrating
0
0 Votos

Compartir

    During the reconstruction of the Valmiera Theatre building (2021-2024), artistic activities were never interrupted - the preparation of new productions and performances in the Round Hall continued. The promised one winter of patience turned into three. Rehearsals and performances took place in various locations in Valmiera, but the theatre building, despite the lack of water and heat, was never abandoned - with construction crews, through the dust and cold, actors and other theatre staff went to the rehearsal hall, the Round Hall, the carpentry workshop, and the administration to work as if nothing were unusual or difficult.

    Ver Cast

    Géneros

    Cast

    🎬 Pelis Harvey

    Made with

    Design by

    Harvey.dev

    This product uses the

    TMDB API

    but is not endorsed or certified by TMDB.